September 6th, 2019 at 3:55 PM
I implemented an ESURE setup. I did it twice. The first implementation did not produce any traffic, but I had botched it somehow, and fixed, possibly in an incomplete way. I deleted it and did it a second time, differently in that the subway segment was longer and there was more rework of the Maxis roadways and commercial areas. It looks like this:
The main point is that this setup does not work better than the first one, after several years of running the city there is zero traffic on the link. I have decided to ignore this and leave it as is. Maybe the rail link is no longer attractive in the city because there are other ways of going around including using the subway network.
The main point is that this setup does not work better than the first one, after several years of running the city there is zero traffic on the link. I have decided to ignore this and leave it as is. Maybe the rail link is no longer attractive in the city because there are other ways of going around including using the subway network.