August 25th, 2019 at 7:05 AM
In my previous post #56 I showed an old parclo in Lessy that required a rework. This has been done, and the side effects were very minimal, the other existing roadways didn't require any change, and there were no railway tracks in the area that would necessitate an ESURE-type setup. For the record, here is the area right after the rework of the highway junction. Entrance/exit ramps on the northern branch were also modified. Commercial redevelopment has not yet taken place, this will happen next.